Hi
The Plan Usage shows: “You have used 0/2,500 credits.”
But builds fail with with “This job has been blocked because no credits are available on your plan. Please upgrade to continue building.”
Thanks,
Rotem,
Hi
The Plan Usage shows: “You have used 0/2,500 credits.”
But builds fail with with “This job has been blocked because no credits are available on your plan. Please upgrade to continue building.”
Thanks,
Rotem,
I think this may be a timezone issue, credits appear to be refilled on Sunday evening in PST. Where are you located?
Now it works.
I’m located in Israel (+2)
Last failed try was at night 00:00 (next day) IST
So there are two issues:
This makes the different of more than 24 hours.
Thanks,
Rotem.