Hi, we have two branches, master and staging. We want to make automatic deploys on staging, but after the PR is open, the deploy jobs in our workflow is triggered, but I want that this job only when the PR is merged. Is this possible? Thanks.
This topic was automatically closed 90 days after the last reply. New replies are no longer allowed.